Amrumbank West in a German offshore wind farm in the North Sea owned by RWE.
It is located about 35 km northwest of the island of Heligoland and around 18 km south-west of the Amrum Bank sandbank.
It consists of 80 turbines in waters 19–24 m deep.
Construction
Construction cost was around .
[ Factsheet Amrumbank West (PDF; 1,2 MB). Eon, retrieved 21 April 2012.]
The project was delayed 15 months by the lack of power lines.
[ German wind energy plans in the doldrums. Thenational.ae (6 March 2012). Retrieved on 2015-05-10.]
The 80 wind turbines are Siemens SWT-3.6–120 with a rated power of 3.6 MW and a rotor diameter of 120 meters.
[ Siemens sichert sich Auftrag für Offshore-Windkraftwerk in Deutschland. Siemens, 15 December 2011, retrieved 23 December 2011.]
Offshore construction began in 2013, and the first turbine was installed in February 2015.
The wind farm was commissioned at the end of 2015.
Seabed protection
The seabed surface at the construction site mainly consists of sand. It was initially reinforced by a 2.4-m-thick layer of large stones. However, this hindered installation of the turbine piles, which should be driven through the protection layer deep into the seabed. Therefore, stones were replaced by two layers of
geotextile containers, i.e., sandbags made of a special damage-resistant nonwoven geotextile. Empty bags had a size of 1.45 × 2.38 m and could accommodate 1 m
3 of sand; they were filled on the Rømø island up to 80 vol% and weighed 1400 kg each. The seabed protection withstood the St. Jude storm in October 2013 and
Cyclone Xaver in December 2013. Starting from December 2013, turbine piles 6 m in diameter were driven through the erosion protection layers.
[
]
See also
-
List of offshore wind farms in Germany
-
Wind power in Germany
-
List of offshore wind farms